Machine Shops Opportunities

In the application: Main Menu β†’ Machine Shops Opportunities

Watch the available lessons in order, or choose the chapter you need. A lesson may also appear in another button path.

Watch the learning sequence

Follow these lessons in order. Shared screens may use another example; chapter links open the relevant step.

1. Machine Shops Opportunities: FSC 5305 item and drawings

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Open Fabrication Station
  2. 0:13 β€” Choose FSC 5305 Screws
  3. 0:31 β€” Read a representative opportunity
  4. 0:59 β€” Choose a result link
  5. 1:22 β€” Read flags, quantities and dates
  6. 1:47 β€” Open the selected NSN item
  7. 2:22 β€” Open the drawing list
  8. 2:55 β€” Select drawings and return

2. Machine Shops: download the selected drawings

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Download the selected drawings

3. Review an NSN item and its supporting research

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Confirm the selected item
  2. 0:21 β€” Review technical characteristics
  3. 0:48 β€” Review award history
  4. 1:12 β€” Review FLIS header
  5. 1:33 β€” Review MOE rules
  6. 1:57 β€” Review reference numbers
  7. 2:21 β€” Review shipping classification
  8. 2:38 β€” Review ML-C
  9. 2:58 β€” Review dated inventory
  10. 3:22 β€” Compare backorder and demand

4. Export and read an item’s part references

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Export the selected item’s reference table
  2. 0:30 β€” Read the three worksheet columns

5. Read the lower sections of a combined NSN report

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Read the management rows
  2. 0:55 β€” Read the award rows
  3. 1:37 β€” Match technical labels to their values
  4. 2:12 β€” Read associated documents
  5. 2:38 β€” Read substitute relationship fields
  6. 3:21 β€” Read the organizational management rules

6. Drawings: find and open a stock-item document

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Open Drawings from Main Menu
  2. 0:08 β€” Open the Drawings search
  3. 0:27 β€” Choose a stock number or drawing reference
  4. 0:39 β€” Read the seven drawing rows
  5. 1:03 β€” Identify the document and sheet
  6. 1:26 β€” Open the selected QAP sheet
  7. 1:52 β€” Return to the drawing list

7. Drawings: exact and prefix searches

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Search an exact drawing reference
  2. 0:11 β€” Read the associated stock numbers
  3. 0:32 β€” Find a family of drawing references
  4. 0:44 β€” Distinguish drawings from their sheets
  5. 1:05 β€” Continue through results and open a sheet

8. Search by NSN and follow item references

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Open Search by NSN/NIIN
  2. 0:05 β€” Enter the NIIN
  3. 0:18 β€” Confirm the item
  4. 0:36 β€” Open the referenced company
  5. 0:51 β€” Return to the item
  6. 1:02 β€” Review the combined report
  7. 1:18 β€” Review the drawing references
  8. 1:43 β€” Open QAP-EQ001 sheet 0001

9. Prepare an NSN batch report

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Prepare an NSN batch report
  2. 0:35 β€” Select report sections
  3. 1:21 β€” Identify the report workbook and its tabs
  4. 1:38 β€” Read the battery MCRL reference
  5. 1:47 β€” Read the sling TechChars reply
  6. 2:00 β€” Identify the award-only workbook tabs
  7. 2:11 β€” Read the sling award line

10. Search technical characteristics for a brake shoe

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Search by technical characteristics
  2. 0:13 β€” Enter item-description keywords
  3. 0:15 β€” Choose the matching description
  4. 0:28 β€” Read the requirements and starting count
  5. 0:55 β€” Select a fabrication method
  6. 1:21 β€” Narrow by diameter and width
  7. 1:46 β€” Review the three matching stock numbers

11. Read the NSN batch-report workbook

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Read item identity and assignment fields
  2. 0:30 β€” Read the remaining catalog indicators
  3. 1:04 β€” Match part references to CAGE and company
  4. 1:53 β€” Read requirements beside their replies
  5. 2:34 β€” Read ML-C supply, unit and price fields
  6. 3:07 β€” Read ML-C control and service fields
  7. 3:41 β€” Read MOE rule rows
  8. 4:30 β€” Identify associated document references
  9. 5:03 β€” Read substitute relationships
  10. 5:49 β€” Identify each returned award line
  11. 6:11 β€” Read price, date and the sling example
  12. 6:46 β€” Use the right view for the next question

12. NSN Market Analysis 3 Years: CAGE, NSN, and product searches

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Open NSN Market Analysis
  2. 0:13 β€” Choose one search route
  3. 0:35 β€” Search by National Stock Number
  4. 0:58 β€” Read the company row
  5. 1:14 β€” Search by company CAGE
  6. 1:37 β€” Open the unique-NSN list
  7. 1:54 β€” Move through the NSN pages
  8. 2:07 β€” Find candidates by product name
  9. 2:30 β€” Open one candidateΓƒΒ’Γ’β€šΒ¬Γ’β€žΒ’s market report
  10. 2:55 β€” Return or clear the search
  11. 3:11 β€” Read each measure by its heading

13. NSN Forecasting: monthly item and quarterly class reports

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Search by NSN or NIIN
  2. 0:37 β€” Read the monthly forecast row
  3. 1:32 β€” Choose a Federal Supply Class
  4. 1:46 β€” Read the quarterly FSC 5305 report

14. APL/AEL Historical: hydraulic pump parts and characteristics

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Open APL/AEL Historical
  2. 0:16 β€” Choose a search field
  3. 0:40 β€” Find the hydraulic-pump list
  4. 1:01 β€” Confirm the selected list
  5. 1:30 β€” Read the Parts List columns
  6. 1:50 β€” Compare the four parts
  7. 2:16 β€” Open Component Characteristics
  8. 2:43 β€” Check the remaining characteristic fields
  9. 3:13 β€” Return to parts or start another search

15. My Projects Folder: find a saved opportunity and browse its files

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Open My Projects Folder
  2. 0:13 β€” Compare the three saved-work sections
  3. 0:40 β€” Read the saved stock-number row
  4. 1:08 β€” Open the matching project folder
  5. 1:30 β€” Read the project file pane
  6. 1:55 β€” Review the upload dialog controls
  7. 2:23 β€” Open Notes and return to the folder list
  8. 2:42 β€” Return to My Projects Folder

16. Save an opportunity and upload project notes

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Find the saved opportunity
  2. 0:29 β€” Select a document for Notes
  3. 0:55 β€” Verify the uploaded document

17. Remove a saved notice and return to its project files

Watch from the beginning

Choose a chapter
  1. 0:00 β€” Choose the saved notice to remove
  2. 0:22 β€” Check the saved listing after removal
  3. 0:44 β€” Return to the existing project and note

18. Read associated documents and substitute references

Watch this chapter

Choose a chapter
  1. 3:05 β€” Open Associated Documents
  2. 3:27 β€” Choose the matching document number
  3. 4:01 β€” Read the listed specification revisions
  4. 4:43 β€” Open Substitutes
  5. 4:54 β€” Read the substitute relationship row